Québec Map
Québec / Baden-WürttembergPower Grid
After preparing the starting market, set aside plants 13, 18 and 22 and prepare the rest as usual; with 2 to 4 players do not remove ecological plants when removing random plants. Put 13, 18 and 22 face down on top of the stack with 13 on top. Resource prices start at coal 2, oil 2, garbage 7 and uranium 14, with the Québec refill table. In Bureaucracy, when you put the highest future-market plant below the stack, never take an ecological one; take the next highest. The sheet recommends choosing at least one region with Montreal or Québec so the distant regions have enough links.
With The New Power Plants: Set 2: With Set 2, put ecological plant 11 in the market and add 7 shuffled plug-back plants. Set aside ecological plants 17 and 24 face up, and put them on top of the stack in ascending order.
Ask RuleRunner about Power Grid
Also answers
how do i set up quebechow do i set up québecquébec mapquebec mapquebec setupquebec plants 13 18 22quebec ecological plantsquebec resource pricesquebec refill tablequebec bureaucracy
More Québec / Baden-Württemberg rules
All Power Grid rules and how to play · More about Power Grid