RuleRunner

Québec / Baden-Württemberg rules

ExpansionPower Grid

Québec / Baden-Württemberg is an expansion for Power Grid. map expansion.

Ask RuleRunner about Power Grid

How Québec / Baden-Württemberg changes play

Québec / Baden-Württemberg

These maps are played with Power Grid (Recharged or the original). Everything else is unchanged.

  1. Setup: Québec: after preparing the starting market, set aside plants 13, 18 and 22 and prepare the rest as usual. With 2 to 4 players do not remove ecological plants when removing random plants.
  2. Setup: Québec: put plants 13, 18 and 22 face down on top of the stack with 13 on top. Resource prices start at coal 2, oil 2, garbage 7 and uranium 14. Use the Québec refill table. The sheet recommends a region with Montreal or Québec.
  3. Québec Bureaucracy: when putting the highest future-market plant below the stack, never take an ecological plant; take the next highest.
  4. Baden-Württemberg rounds: the first two phases swap, so each round is buy plants, determine player order, buy resources, build, Bureaucracy. If no plant is sold, remove the two lowest plants and draw two.
  5. Baden-Württemberg building: transregional cities such as Strasbourg open only in Step 2, and cost 15 or 20 Elektro. Step 2 starts at 9 cities (2 players), 6 cities (3 to 5 players) or 5 cities (6 players). Resupply uses the Baden-Württemberg refill table.

All Québec / Baden-Württemberg rules (3)

Other Power Grid expansions

All Power Grid expansions

All Power Grid rules and how to play · More about Power Grid