Update the Power Plant Market
BureaucracyPower Grid
In Steps 1 and 2, put the highest-numbered plant of the future market face down below the stack and draw a replacement; re-sort. Those plants gather under the Step 3 card and come into play in Step 3. In Step 3, remove the smallest plant in the current market from the game and draw a replacement.
With Middle East / South Africa: On the Middle East, during Step 2 put the two biggest future-market plants face down below the stack, one after the other, drawing a replacement after the first.
Ask RuleRunner about Power Grid
Also answers
update the power plant marketreplace a plant in bureaucracyremove the highest planthighest future market plantwhat happens to the plant market in bureaucracyplant removed at end of roundbottom of the stackcycle the plant marketnew plant each round
More Bureaucracy rules
All Power Grid rules and how to play · More about Power Grid