RuleRunner

Update the Power Plant Market

BureaucracyPower Grid

In Steps 1 and 2, put the highest-numbered plant of the future market face down below the stack and draw a replacement; re-sort. Those plants gather under the Step 3 card and come into play in Step 3. In Step 3, remove the smallest plant in the current market from the game and draw a replacement.

With Middle East / South Africa: On the Middle East, during Step 2 put the two biggest future-market plants face down below the stack, one after the other, drawing a replacement after the first.

Ask RuleRunner about Power Grid

Also answers

update the power plant marketreplace a plant in bureaucracyremove the highest planthighest future market plantwhat happens to the plant market in bureaucracyplant removed at end of roundbottom of the stackcycle the plant marketnew plant each round

More Bureaucracy rules

All Power Grid rules and how to play · More about Power Grid