Middle East Steps
Middle East / South AfricaPower Grid
Step 2 starts at the start of the next phase after the Step 3 card is drawn for the first time, and connecting 7 cities does not trigger it. Shuffle the stack with the remaining plants and put the Step 3 card back face down below it, then continue the phase, drawing a new plant if needed. At the start of Step 2, once only, remove the two lowest-numbered plants from the current market into the box one after the other: remove the first, draw a new plant, then remove the second. Step 3 starts at the start of the next phase after the Step 3 card is drawn the second time.
Ask RuleRunner about Power Grid
Also answers
what is removed at the start of step 2 in the middle eastmiddle east stepsmiddle east step 2does 7 cities start step 2 in the middle eastmiddle east step 3when does step 2 start in the middle eaststep 3 card drawn twicemiddle east shuffle the stackmiddle east remove two plantsstep 2 triggered by the step 3 card
More Middle East / South Africa rules
- Middle East Setup
- Middle East Garbage and Nuclear Plants
- Middle East Resupply and Market Update
- South Africa Setup
- South Africa Coal Storage
- South Africa Connections and Metropolises