RuleRunner

Brazil / Spain & Portugal rules

ExpansionPower Grid

Brazil / Spain & Portugal is an expansion for Power Grid. map expansion (Recharged).

Ask RuleRunner about Power Grid

How Brazil / Spain & Portugal changes play

Brazil / Spain & Portugal

These maps are played with Power Grid (Recharged or the original). Everything else is unchanged.

  1. Setup: Brazil resource market: coal on spaces 1–8, oil 3–8, biogas 6–8, uranium 14–16. Use the Brazil refill card. On the Brazil map garbage plants are biogas plants and garbage tokens are biogas tanks.
  2. Setup: Brazil plants: always use all biogas plants. Put plants 6 and 14 in the market, then add 6 plug-back plants. When building the stack, set all remaining biogas plants aside, remove plants for the player count, then shuffle the biogas plants back in.
  3. Setup: Spain and Portugal: set plants 18, 22 and 27 aside face up. Resource market: coal on spaces 1–8, oil 3–8, garbage 6–8, uranium 5–16. Use that map's refill card.
  4. Spain and Portugal uranium: no uranium is added at resupply in Step 1.
  5. Spain and Portugal Step 2: at the start of Step 2 put plants 27, 22 and 18 on top of the plant stack, 18 on top, so 18 replaces the plant removed at the start of Step 2.
  6. Portugal: a player whose network is only in Portugal cannot buy nuclear plants or offer them for auction.

All Brazil / Spain & Portugal rules (3)

Other Power Grid expansions

All Power Grid expansions

All Power Grid rules and how to play · More about Power Grid